Road closure update for PT run route

Parts of 25th Street and Range Road have been added to the installation’s existing physical training run route and will be closed for vehicle traffic from 5:30 to 7:30 a.m. Monday through Friday. The new addition extends from Lane Avenue to the four-way stop sign at Range Road.

read more

FG_AUTHORS: via Fort Gordon PAO

Read more http://www.ftgordonsignal.com/news/2014-03-21/News_Update/Road_closure_update_for_PT_run_route.html


Capabilities and Integrations Directorate Seal

The Signal

- By Bonnie Heater Fort Gordon Public Affairs Office This year’s winter storm showed that icy road conditions can be hazardous, but so can...
- By Sgt. Ashley M. Armstrong 35th Signal Brigade Public Affairs “Soldiers have to be the ultimate athletes because their performance is...
- By Bonnie Heater Fort Gordon Public Affairs Office The downsizing of the military is happening across all services, but so is the effort to...
- The U.S. Army Signal Center of Excellence will become the Cyber Center of Excellence during a ceremony at Fort Gordon’s Gate 1 today at 10 a.m. In order to prepare for and conduct the ceremony,...
- Effective immediately, the Defense Finance and Accounting Service will require battalion commanders to approve Soldiers’ requests for Basic Allowance for Subsistence, or BAS. The requirement...
- By Lt. Col. Chevelle Thomas HRC Public Affairs U. S. Army Human Resources Command established a provisional Cyber Branch March 20, to provide career management,...
- By Karen J. Lewis Survivor Outreach Services coordinator The Gold Star Wives of America was formed before the end of World War II to provide...
- read moreFG_AUTHORS: via Fort Gordon PAO10p1.preview.jpgSize: 0.02 Mb...